Testking 000-330 Solutions Expert Exam Questions

The IBM 000-330 certificates give you possibility to work in any country of the world because they are acknowledged in all countries equally. This IBM 000-330 torrent certificate helps
not only to improve your knowledge and skills, but it also helps your career, gives a possibility for qualified usage of IBM 000-330 exam products under different conditions. The
majority of companies in the sphere of information technologies require the presence of IBM 000-330 exams for the work in the company, and that makes obtaining this IBM 000-330
certificate necessary. Many IT specialists were not able to obtain the real IBM 000-330 certificate from the first attempt, which was the result of poor preparation for the
examination, using Testking 000-330 questions, lab and audio.

When 000-330 candidates first started offering the 000-330 exam questions and answers and exam simulator, they never dreamed they would be making the claims that we do now in the form of our unbelievable guarantee. TestKing.com GUARANTEES that you will pass your 000-330 exam on your first attempt after using one of our 000-330 training products. That’s right, with the 100% pass rate, the exam tools that we have created for you are so good – we can’t help but guarantee your results.

Known also as the IBM Power Systems Technical Support for AIX and Linux (000-330), this exam plays an integral role in obtaining your certification. All IBM certification exams are extremely detailed and cover many different technological areas. We designed the 000-330 questions and answers for this very purpose, to prepare you for the unexpected. Beyond the testing center, the skills you learn and the knowledge you confirm using the 000-330 practice exams and exam simulators will translate directly into your daily work environment.

When available, take advantage of the TestKing 000-330 Value Pack and save time and money while developing your skills to pass your ‘Power Systems Technical Support for AIX and Linux Exam’ and grab that IBM certification. Let us help you climb that ladder of success and pass your 000-330 now!


The customer has a 7014-B42, a 7014-T00, and a 7014-T42, each with available space. Which
rack/racks support(s) the installation of the BladeCenter H?
A. 7014-B42
B. 7014-T00
C. 7014-T42
D. 7014-B42, and 7014-T42
Answer: A
Which of the following supports a Linux-based HA solution?
A. SE Linux
B. GPFS for Linux
C. Cluster Systems Manager (CSM)
D. PowerHA Cluster Manager for AIX and Linux
Answer: D
How can a company that is concerned about energy costs in the datacenter use Power servers to better
manage energy usage?
A. Set energy management parameters with AEM
B. Set energy management parameters with IVM
C. Set energy management parameters within AIX
D. Set energy management parameters with the HMC
Answer: A
A customer is consolidating LAMP on Power. They would like to also consolidate Linux x86 OLTP
applications. Which of the following should be discussed?
A. Requires PowerVM Lx86
B. Requires AIX 5.3 or later.
C. Native port is recommended
D. Enabled with the AIX Linux Toolkit
Answer: C
A large customer has many POWER4 servers that have been sized for their peak workload but are under
utilized most of the time. They are at the end of their lease and want to purchase POWER6 servers. Which
PowerVM technology will maximize their server utilization?
A. Workload Partitions
B. Partition Load Manager
C. Shared Processor Pools
D. Live Partition Mobility
Answer: C
Which of the following is a competitive advantage of IBM PowerVM compared to HP Integrity Virtual
Machines (IVM)?
A. PowerVM provides the capability to support shared CPU, memory and I/O resources.
B. PowerVM Editions are supported on Power systems from low to high-end servers and blade servers.
C. AIX and Linux interface directly with the hardware and the hardware ensures isolation is maintained.
D. Processing resources can be dynamically allocated and shared between logical partitions with
PowerVM.
Answer: C
7. Which of the following does IBM Fix Central provide to customers?
A. Customer hotline for immediate dispatch of service personnel for critical issues.
B. Designated local service center for each customer location with a maintenance contract.
C. Subscription based on-site service agreement for regularly scheduled system maintenance.
D. Web site access to PTFs and updates for system software, hardware, and operating systems.
Answer: D
8. A mid market customer wants to compare Power Systems performance to HP PA-RISC performance
from a complete systems perspective. Which performance metric should be used?
A. RPE2
B. SWAP
C. rPerf
D. SPECint 2006
Answer: A
9. How many network cards can be added to the JS12 and JS22 Blades?
A. JS12 = 1, JS22 = 1
B. JS12 = 2, JS22 = 2
C. JS12 = 1, JS22 = 2
D. JS12 = 2, JS22 = 1
Answer: B
10. Which of the following options for PowerHA Cluster Manager can help simplify implementation and
configuration in a DB2 and WebSphere environment?
A. Smart Assist
B. Insight Utility
C. Virtual Image Manager
D. Cluster Systems Management
Answer: A
A customer has an 8-core POWER6 570 with 4 active processors. They have dedicated partitions. They
have occasional need for additional CPU capacity. They do not want permanent activations and want to
have monthly post billing for usage. What type of CoD best meets their requirements?
A. Trial CoD allows short term processor and memory activations.
B. Utility CoD autonomically provides additional processor performance on a temporary basis.
C. On/Off CoD enables processors to be temporarily activated in full-day increments as needed.
D. Capacity Upgrade on Demand (CUoD) allows you to purchase additional processor capacity and
dynamically activate it when needed.
Answer: C
12. Which of the following is the appropriate disk configuration for an application that requires faster writes
over availability?
A. RAID 0
B. RAID 1
C. RAID 5
D. RAID 6
Answer: A
13. Which IBM technical resource provides guideance, installation and tmplementation examples?
A. IBM InfoCenter
B. IBM Sales Manual
C. IBM Installation Guides
D. IBM Technical Sales Library
Answer: A
14. Which of the following features of Active Energy Manager help customers save energy costs?
A. Power capping
B. Fan speed management
C. Active power leveling
D. Power regulator management
Answer: A
15. Which of the following correctly describes Utility Capacity on Demand?
A. Additional processors can be assigned to any partition and are billed to the customer as units of 1 day.
B. Additional processors can be assigned to any partition and are billed to the customer as units of 1
minute.
C. Additional processors are assigned to the shared processor pool and are billed to the customer as units
of 1 day.
D. Additional processors are assigned to the shared processor pool and are billed to the customer as units
of 1 minute.
Answer: D
16. The improved latency of the Integrated Virtual Ethernet Adapter (IVE) can be attributed to which of the
following?
A. Direct connection to GX+ Bus
B. Direct connection to PCIe Bus
C. Direct connection to multiple port groups
D. Direct connection to Virtual Memory Manager (VMM)
Answer: A
17. What components, in addition to AIX V6.1 or greater, are required to support relocating a Workload
Partition (WPAR) from one physical system to another?
A. POWER6-based hardware and IBM Workload Partition Manager for AIX
B. PowerVM Standard Edition and compatible hardware and software levels
C. IBM Workload Partition Manager for AIX and compatible hardware and software levels
D. POWER6-based hardware, IBM Workload Partition Manager for AIX, and PowerVM Enterprise Edition
Answer: C
18. A customer wants a 16-core POWER6 server and requires a large number of high performance PCI-X
adapters, with the capability to add additional processor cores and grow to 2TB of memory in the future.
Which solution should be recommended?
A. A 16-core 590
B. A 16-core 595
C. A 16-core 570 with 7311-D11 drawers
D. A 16-core 590 with 7040-61D drawers
Answer: B
19. Which of the following most accurately describes dynamic processor deallocation?
A. The service processor deallocates failed processors in increments of 0.01 processing units.
B. The Hypervisor dynamically redistributes the data from the de-allocated processor to other processors in
the system.
C. The processor is dynamically de-allocated and its processes and cache registers are reassigned to
available processors.
D. The Hypervisor allocates equivalent processor capacity from other cores, moves the workload, then
deallocates the failed processor.
Answer: D
20. Which of the following is a competitive advantage of PowerVM Enterprise Edition?
A. Ability to manage multiple servers
B. Ability to rapidly deploy applications
C. Ability to move running partitions between systems
D. Ability to move running applications between partitions
Answer: C